Book Chapters:

 

1. N. Safaei, D. Banjevic and A.K.S. Jardine, Multi-objective Simulated Annealing for a Maintenance Workforce Scheduling Problem: A case Study, Global Optimization: Focus on Simulated Annealing, ARS Publishing, Ed. Cher Ming Tan, pp. 27-48, 2008. ISBN 978-953-7619-07-7.

2. R. Tavakkoli-Moghaddam1 and N. Safaei, A New Mathematical Model for Flexible Flow Lines with Blocking Processor and Sequence-Dependent Setup Time, Multiprocessor Scheduling: Theory and Applications, ARS Publishing, Ed. Vedran Kordic, pp. 255-272, 2007.

3. R. Tavakkoli-Moghaddam, N. Safaei and M. Babakhani, Solving a dynamic cell formation problem with machine cost and alternative process plan by memetic algorithm, In: O. B. Lupanov, O.M. Kasim-Zade, A.V. Chaskin and K. Steinhofel (eds.), Lecture Notes in Computer Science, Vol. 3777, Springer, Berlin, pp. 213-227, 2005.

Accepted/Published Papers:

 

1. C. Kiassat, N. Safaei, D. Banjevic, Effects of Operator Learning on Production Output: A Markov Chain Approach, Accepted for publication in Journal of Operational Research Society, 2014 (doi:10.1057/jors.2013.98).

2. C. Kiassat, N. Safaei, D. Banjevic, Choosing the Optimal Intervention Method to Reduce Human-related Machine Failures, accepted for publication in European Journal of Operational Research, Vol. 233, No. 3, pp. 604–612, 2014 (http://dx.doi.org/10.1016/j.ejor.2013.09.002).

3. N. Safaei, Reza Tavakkoli-Moghaddam and Corey Kiassat, A hybrid particle swarm optimization to solve the redundant reliability problems with multiple component choices, Applied Soft Computing, Vol. 12, No. 11 pp. 3462-3471, 2012. (DOI:10.1016/j.asoc.2012.07.020).

4. N. Safaei, A. Zuashkiani, Manufacturing System Design Considering Multiple Machine Replacement under Discounted Costs, to be appeared in IIE Transactions, 2012 (http://www.tandfonline.com/doi/abs/10.1080/0740817X.2012.654845).

5. N. Safaei, D. Banjevic and A.K.S. Jardine, Workforce Planning for Power Restoration in Electricity Delivery Industry: an Integrated Simulation-Optimization Approach, IEEE Transactions on Power Systems, Vol. 27, No. 1, pp. 442-449, 2012 (http://dx.doi.org/10.1109/TPWRS.2011.2166090)

6. N. Safaei, Dragan Banjevic and Andrew K.S. Jardine, Workforce-constrained Maintenance Scheduling for Military Aircraft Fleet: A Case Study, Annals of Operations Research, Vol. 186, No. 1, pp. 295-316 (2011(10.1007/s10479-011-0885-4)

7. N. Safaei, Dragan Banjevic and Andrew K.S. Jardine, Multi-Threaded Simulated Annealing for a bi-objective Workforce-constrained Maintenance Scheduling Problem,  International Journal of Production Research, Vol. 50, No. 1, 2012 (http://dx.doi.org/10.1080/00207543.2011.571444)

8. N. Safaei, D. Banjevic and A.K.S. Jardine, Bi-objective Workforce-constrained Maintenance Scheduling: A Case Study, Journal of Operational Research Society, Vol. 62, pp. 1005 –1018, 2011 (http://dx.doi.org/10.1057/jors.2010.51)

9. T. Zhigang, L. Wong, N. Safaei, A Neural Network Approach for Remaining Useful Life Prediction Utilizing Both Failure and Suspension Histories, Mechanical Systems and Signal Processing, vol. 24, No., 5, pp. 1542-1555, 2010 (10.1016/j.ymssp.2009.11.005)

10. N. Safaei, Reza Tavakkoli-Moghaddam and Farrokh Sassani, A Series-Parallel Redundant Reliability System for the Cellular Manufacturing Design, Proceedings of the Institution of Mechanical Engineers, Part O, Journal of Risk and Reliability, vol. 223, No. 3, pp. 233-250, 2009.

11. N. Safaei, D. Banjevic and A.K.S. Jardine, Impact of the Use-based Maintenance Policy on the Performance of Cellular Manufacturing Systems, International Journal of Production Research, vol. 48, No. 8, pp. 2233 - 2260, 2010 (http://dx.doi.org/10.1080/00207540802710273) 

12. N. Safaei,  R. Tavakkoli-Moghaddam, Integrated multi-period cell formation and subcontracting production planning in dynamic cellular manufacturing systems, International Journal of Production Economics, Vol. 120, No. 2,  pp. 301-314, 2009 (10.1016/j.ijpe.2008.12.013).

13. N. Safaei,  R. Tavakkoli-Moghaddam, An Extended Fuzzy Parametric Programming-based Approach for Designing Cellular Manufacturing Systems under Uncertainty and Dynamic Conditions, International Journal of Computer Integrated Manufacturing. vol. 22, No. 6, pp. 538–548, 2009 (10.1080/09511920802616773).

14. Tavakkoli-Moghaddam, R., N. Safaei, and Azaron, A., Designing a fuzzy system for controlling the armament fire in dynamic siege, Expert Systems with Applications, Vol. 36, No. 9, pp. 11691-11698, 2009 (http://dx.doi.org/10.1016/j.eswa.2009.03.010).

15. M. Bazzazi, N. Safaei and N. Javadian, A genetic algorithm to solve the storage space allocation problem in a container terminal, Journal of Computer and Industrial Engineering. Vol. 56, pp. 44–52, 2009 (10.1016/j.cie.2008.03.012).

16. R. Tavakkoli-Moghaddam, N. Safaei, F. Sassani, A memetic algorithm for the flexible flow line scheduling problem with processor blocking, Journal of Computers and Operations Research, vol. 36, No. 2, pp. 402-414, 2008 (10.1016/j.cor.2007.10.011).

17. N. Safaei, M. Saidi-Mehrabad, R. Tavakkoli-Moghaddam and F. Sassani, A Fuzzy Programming Approach to a Cell Formation Problem with Dynamic and Uncertain Conditions, Journal of Fuzzy Sets and Systems, vol. 159, pp.  215 – 236, 2008 (http://dx.doi.org/10.1016/j.fss.2007.06.014).

18. R. Tavakkoli-Moghaddam, N. Safaei, F. Sassani, A new solution for a dynamic cell formation problem with alternative routing and machine costs using simulated annealing. Journal of Operational Research Society, Vol. 59, pp. 443–454, 2008 (http://dx.doi.org/doi:10.1057/palgrave.jors.2602436).

19. R. Tavakkoli-Moghaddam, N. Safaei and M.M.O. Kah, Accessing feasible space in a generalized job shop scheduling problem with the fuzzy processing times: a fuzzy-neural approach, Journal of Operational Research Society, Vol. 59, pp. 431–442, 2008 (http://dx.doi.org/10.1057/palgrave.jors.2602351).

20. N. Safaei, M. Saidi-Mehrabad, M.S. Jabal-Ameli, A hybrid simulated annealing for solving an extended model of dynamic cellular manufacturing system, European Journal of Operational Research, vol. 185 (2), pp 563-592, 2008 (http://dx.doi.org/10.1016/j.ejor.2006.12.058).

21. N. Safaei, M. Saidi-Mehrabad and M. Babakhani, Designing cellular manufacturing systems under dynamic and uncertain conditions, Journal of Intelligent Manufacturing, Vol. 18, pp. 383–399, 2007 (http://dx.doi.org/10.1007/s10845-007-0029-5).

22. M. Saidi-Mehrabad and N. Safaei, A new model of dynamic cell formation by a neural approach, International Journal of Advanced Manufacturing Technology, Vol. 33, 1001-1009, 2007 (http://dx.doi.org/10.1007/s00170-006-0518-2).

23. A. Azaron, M. Sakawa, R. Tavakkoli-Moghaddam and N. Safaei, A discrete-time approximation technique for the time-cost trade-off in PERT networks, Rairo-OR, Vol. 41, pp. 61-81, 2007 (http://dx.doi.org/10.1051/ro:2007005).

24. R. Tavakkoli-Moghaddam, M.B. Aryanezhad, N. Safaei, M. Vasei and A. Azaron, A new approach for the cellular manufacturing problem in fuzzy dynamic conditions by a genetic algorithm, Journal of Intelligent & Fuzzy Systems, Vol 18 (4), pp. 363-376, 2007.

25. R. Tavakkoli-Moghaddam, N. Safaei, M.M.O. Kah and M. Rabbani, A new capacitated vehicle routing problem with split service for minimizing fleet cost by simulated annealing, Journal of the Franklin Institute, Vol, 344(5), pp. 406-425, 2007 (http://dx.doi.org/10.1016/j.jfranklin.2005.12.002).

26. N. Safaei, S.J. Sadjadi and M. Babakhani, An efficient genetic algorithm for determining the optimal price discrimination, Applied Mathematics and Computation, Vol. 181(2), pp. 1693-1702, 2006 (10.1016/j.amc.2006.03.022).

27. S.M. Seyed-Hosseini, N. Safaei and M.J. Asgharpour, Reprioritization of failures in a system failure mode and effects analysis by decision making trial and evaluation laboratory technique, Reliability Engineering and System Safety, Vol. 91(8), pp. 872-881, 2006 (http://dx.doi.org/10.1016/j.ress.2005.09.005).

28. R. Tavakkoli-Moghaddam, N. Safaei and Y. Golipour, A hybrid metaheuristic for Capacitated vehicle routing problem independent of route length, Applied Mathematics and Computation, Vol. 176(2), pp. 445-454, 2006 (http://dx.doi.org/10.1016/j.amc.2005.09.040).

29. R. Tavakkoli-Moghaddam, M.B. Aryanezhad, N. Safaei, A. Azaron, Solving a dynamic cell formation problem using metaheuristics, Applied Mathematics and Computation, Vol. 170, pp. 761-780, 2005 (http://dx.doi.org/10.1016/j.amc.2004.12.021).

Conference Papers

 

1. N. Safaei, Simultaneous Aircraft Routing and Maintenance Workload Management, AGIFORS Airline Operations, Frankfurt, Germany, 18-21 June, 2013.

2. N. Safaei, A.K.S. Jardine, An Integrated Module for Aircraft Maintenance Routing and Work Packaging, INFORMS Annual Meeting, Phoenix, AZ, U.S.A., 14-17 October, 2012.

3. N. Safaei, Aircraft Maintenance Routing Using Detailed Maintenance Program, INFORMS Annual Meeting, Charlotte, NC, U.S.A., 13-16 November, 2011

4. A. Zuashkiani, N. Safaei, A.K.S. Jardine, Long & Medium-term Forecasting of Operation & Maintenance Costs in an Electrical Utility: Case Study Using Principle of Evidence Based Asset Management, ICOMS Asset Management Conference, 16-20 May 2011, Gold Coast, Australia.

5. N. Safaei, Dragan Banjevic and Andrew K.S. Jardine, Workforce-constrained Maintenance Scheduling for Aircraft Fleet: A Case Study, Proceedings of 16th ISSAT International Conference on Reliability and Quality in Design, Washington D.C., U.S.A., 5-7 August, 2010, pp. 291-297.

6. N. Safaei, Behzad Ghodrati, Maintenance Workforce Management: A Case Study, Proceeding of the 1st International Congress on e-Maintenance, Lulea, Sweden, 22-24 June, 2010, pp. 38-45.

7. C. Kiassat and N. Safaei, Integrating Human Reliability Analysis into a Comprehensive Maintenance optimization Strategy, 4th World Congress on Engineering Asset Management (WCEAM), Athens, Greece, 28-30, September, 2009.

8. N. Safaei and A.K.S. Jardine, A Parallel Simulated Annealing for a Multi-objective Maintenance Workforce Scheduling Problem, 9th CORS-INFORMS International meeting, Toronto, 14-17, June, 2009.

9. N. Safaei, D. Banjevic and A.K.S. Jardine, Multi-objective Maintenance Workforce Scheduling in a Steel Company, 13th IFAC Symposium on Information Control Problems in Manufacturing (InCom09), Moscow, 3-5, June, 2009.

10. N. Safaei, D. Banjevic and A.K.S. Jardine, Economic Life of Capital Equipments in a Cellular Manufacturing System, 13th IFAC Symposium on Information Control Problems in Manufacturing (InCom09), Moscow, 3-5, June, 2009.

11. N. Safaei, D. Banjevic and A.K.S. Jardine, Modeling a Multi-objective Maintenance Workforce Scheduling Problem: A case Study, CORS/Optimization Conference, Quebec: Canada, May 12-14, 2008.

12. R. Tavakkoli-Moghaddam, N. Safaei and F. Sassani, Particle swarm optimization for redundant reliability problems with multiple component choice, The 7th Metaheuristics Int. Conf. (MIC2007), Montreal: Canada, June 25-29, 2007.

13. R. Tavakkoli-Moghaddam and N. Safaei, A generalized dynamic cell formation problem with fuzzy demand and unreliable facilities, Proceeding of the 3rd International Conference on Group Technology / Cellular Manufacturing, Groningen:  Netherlands, July 3-5, 2006, pp. 349-356.

14. N. Safaei and R. Tavakkoli-Moghaddam, Reliability consideration in a cell formation problem with parallel-series configuration, Proceeding of the 3rd International Conference on Group Technology / Cellular Manufacturing, Groningen:  Netherlands, July 3-5, 2006, pp. 36-43.

15. N. Javadian, B. Javadi, R. Tavakkoli-Moghaddam and N. Safaei, Possibility linear programming to uniform parallel machines scheduling with sequence-dependent setup times: early/tardy penalties, Proceeding of the 36th International Conference on Computers and Industrial Engineering, Taipei: Taiwan, June 20-23, 2006, pp. 3488-3497.

16. M. Saidi-Mehrabad, N. Safaei and R. Tavakkoli-Moghaddam, A fuzzy parametric programming for cell formation problem in uncertainty and dynamic conditions, Proceeding of the 36th International Conference on Computers and Industrial Engineering, Taipei: Taiwan, June 20-23, 2006, pp. 2703-2713.

17. N. Safaei and R. Tavakkoli-Moghaddam, The use of genetic algorithms for multi-mode resource-constrained project planning with the diminishing returns, Proceeding of the 5th International Symposium on Intelligent Manufacturing Systems, Sakarya, Turkey, May 29-31, 2006, pp. 216-226.

18. R. Tavakkoli-Moghaddam and N. Safaei, Modeling flexible flow lines with blocking and sequence dependent setup time, Proceeding of the 5th International Symposium on Intelligent Manufacturing Systems, Sakarya, Turkey, May 29-31, 2006, pp. 149-158.

19. N. Safaei, R. Tavakkoli-Moghaddam and S. Jabal-Ameli, A generalized cell formation problem in dynamic environment with different inter and intra-cell batch sizes, Proceeding of The 12th IFAC Symposium on Information Control problems in Manufacturing, Saint Etienne, France, May 15-19, 2006, Vol. 2, pp. 401-406.

20. R. Tavakkoli-Moghaddam, N. Safaei and S.A. Torabi, Scheduling of flexible flow lines with blocking by memetic algorithms, Proceeding of the 12th IFAC Symposium on Information Control problems in Manufacturing, Saint Etienne, France, May 15-19, 2006, Vol. 3, pp. 21-26.

21. R. Tavakkoli-Moghaddam and N. Safaei, An EVolutionary Algorithm for a Single-Item Resource-Constrained Aggregate Production Planning Problem, IEEE Congress on Evolutionary Computation, Vancouver, BC, Canada, July 16-21, 2006.

22. R. Tavakkoli-Moghaddam and N. Safaei, A genetic algorithm based on queen bee for scheduling a flexible flow line with blocking, Proceeding of the 1st Tehran International Congress on Manufacturing Engineering (TICME2005), Tehran, Iran, 12-15 December 2005.

23. R. Tavakkoli-Moghaddam, N. Safaei and S.B. Kashani, Modeling diminishing returns in multi-mode resource-constrained project planning by genetic algorithm, Proceeding of the 4th International Industrial Engineering Conference (IIEC2005), Tehran, Iran, December 8-11, 2005.

24. R. Tavakkoli-Moghaddam, N. Safaei and M. Babakhani, A neural approach for constraint satisfaction of a generalized job shop scheduling problem with fuzzy process times, Proceeding of the 3rd European Conference on Intelligent Management Systems in Operations, Salford, U.K., 28-29 June, 2005.

25. R. Tavakkoli-Moghaddam and N. Safaei, A new dynamic cell formation model for determining cell size, routing flexibility, and machine relocation, Proceeding of the 3rd European Conference on Intelligent Management Systems in Operations, Salford, U.K., 28-29 June, 2005.

26. R. Tavakkoli-Moghaddam and N. Safaei, Scheduling of flexible flow lines with blocking by genetic algorithms, Proceeding of the 35th International Conference on Computers & Industrial Engineering (CIE2005), Istanbul, Turkey, 19-22 June, 2005.

27. R. Tavakkoli-Moghaddam, M.S. Mehrabad and N. Safaei, A new generalized cell formation model in uncertainty and dynamic conditions by assuming routing flexibility and machine relocation, Proceeding of The 35th International Conference on Computers and Industrial Engineering (CIE2005), Istanbul, Turkey, 19-22 June 2005.

28. R. Tavakkoli-Moghaddam, M. Rabbani, N. Safaei, and K. Shariat, Vehicle routing problems with soft time windows by an efficient method, Proceeding of the 1st International Conference on Modeling, Simulation and Applied Optimization (ICMSA2005), Sharjah, U.A.E., 1-3 February 2005.